Integrated Bindery Systems

British Engineering logo

New responsive webpage under development

 

Smart-binder Inspection, Cleaning, Lubrication & Preventative Maintenance

Regular Inspection, Cleaning & Lubrication

 

Regular Inspection, Cleaning & Lubrication


Smart-binder Preventative Maintenance (PM)

 

In addition to regular inspection and lubrication IBIS recommends that certain parts of the Smart-binder are checked and replaced annually.

PM parts are recommended to be held at the customer site in addition to the recommended spare parts kits. PM parts kits may be purchased in advance and shipped together with the Smart-binder: If a part is taken from a PM kit because of an emergency (unplanned) need then this missing part should be replaced asap.

See table below:

Annual end of year service
Intervals
PM kit parts for Smart-binder SB-2 or SB-3
PMs listed below only apply to new Smart-binders
For older SBs please   Contact IBIS  
PM kit for
ISG Glue Gun, for SB-3

(not required for SB-2)
PM kit parts for SB-095 sheet feeder
B0001459
View PDF
Download
B0001460
View PDF
Download
19856
Sealing kit for the ECXM glue gun
Year 1
 
Year 2
 
Year 3
 
Year 4    
 
Year 5
 
Year 6
 
Year 7
 
Year 8      
   

The optional IBIS customer support package CSP-90, offered with new Smart-binder sales, includes all Smart-binder PM parts for the first 3-years of operation.

Notes:

  • Refer to IBIS if PM kits are required for further extended time periods, or for other Smart-binder optional modules
  • PM parts are recommended to be held at the customer site in addition to the recommended spare parts kits. If a part is taken from a PM kit because of an emergency (unplanned) need then this missing part should be replaced as soon as possible.
  • Extension of parts warranty beyond the initial 12 month period is dependent upon the above PM parts being fitted annually.